把供应商、客户、政府合同、重大协议、项目与产能做成逐条可核验的关系账本。 每条边都保留方向、证据等级、原文、日期和官方链接,不把“属于同一产业链”当成真实供销关系。
| 关系方向 | 关系 / 状态 | 金额 / 产能 | 证据 | 披露日期 | 详情 |
|---|---|---|---|---|---|
Portland General Electric CoPOR Federal Prison System / Bureau of Prisons ELECTRIC UTILITY SERVICE FOR FY25 | 政府合同 已完成 置信度 98% | $771.3K — | A · 官方确认 PORTLAND GENERAL ELECTRIC COMPANY received a federal award currently valued at $771,321 from Federal Prison System / Bureau of Prisons. ELECTRIC UTILITY SERVICE FOR FY25 |
结构化政府合同或两端官方记录;金额与合同编号可回到原始记录核验。
SEC、公司 IR 或 EIA 正式材料点名对手方、项目或设施;方向不明确时单独标注。
海关、提单等物流信号只能作为线索,不单独写成已确认供销事实。
| 2026-07-30 |
| 核验证据 |
Portland General Electric CoPOR Bureau of Indian Affairs and Bureau of Indian Education ELECTRIC UTILITIES FOR CHEMAWA | 政府合同 已完成 置信度 98% | $290.3K — | A · 官方确认 PORTLAND GENERAL ELECTRIC COMPANY received a federal award currently valued at $290,255 from Bureau of Indian Affairs and Bureau of Indian Education. ELECTRIC UTILITIES FOR CHEMAWA USAspending.gov | 2026-07-30 | 核验证据 |
Portland General Electric CoPOR Indian Health Service ELECTRIC UTILITY SERVICES, WESTERN OREGON SERVICE UNIT, OREGON | 政府合同 已完成 置信度 98% | $279.9K — | A · 官方确认 PORTLAND GENERAL ELECTRIC COMPANY received a federal award currently valued at $279,950 from Indian Health Service. ELECTRIC UTILITY SERVICES, WESTERN OREGON SERVICE UNIT, OREGON USAspending.gov | 2026-07-30 | 核验证据 |
Portland General Electric CoPOR Federal Prison System / Bureau of Prisons ELECTRIC UTILITY SERVICE FY 22 | 政府合同 已完成 置信度 98% | $214.0K — | A · 官方确认 PORTLAND GENERAL ELECTRIC COMPANY received a federal award currently valued at $214,027 from Federal Prison System / Bureau of Prisons. ELECTRIC UTILITY SERVICE FY 22 USAspending.gov | 2026-07-30 | 核验证据 |
Portland General Electric CoPOR Federal Prison System / Bureau of Prisons ELECTRIC UTILITY SERVICE FY 22 OCT-NOV | 政府合同 已完成 置信度 98% | $241.5K — | A · 官方确认 PORTLAND GENERAL ELECTRIC COMPANY received a federal award currently valued at $241,458 from Federal Prison System / Bureau of Prisons. ELECTRIC UTILITY SERVICE FY 22 OCT-NOV USAspending.gov | 2026-07-30 | 核验证据 |
Portland General Electric CoPOR Bureau of Indian Affairs and Bureau of Indian Education ELECTRICITY UTILITY SERVICE FOR CHEMAWA INDIAN SCHOOL | 政府合同 已完成 置信度 98% | $1.1M — | A · 官方确认 PORTLAND GENERAL ELECTRIC COMPANY received a federal award currently valued at $1,072,583 from Bureau of Indian Affairs and Bureau of Indian Education. ELECTRICITY UTILITY SERVICE FOR CHEMAWA INDIAN SCHOOL USAspending.gov | 2026-07-30 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.2 MW | B · 单方官方披露 Portland General Electric Co reports Sullivan generator 13: 1.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 266.8 MW | B · 单方官方披露 Portland General Electric Co reports Tucannon River Wind Farm generator 1: 266.8 MW, Onshore Wind Turbine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.2 MW | B · 单方官方披露 Portland General Electric Co reports Sullivan generator 2: 1.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 已完成 置信度 92% | — 2.7 MW | B · 单方官方披露 Portland General Electric Co reports Faraday generator 3: 2.7 MW, Conventional Hydroelectric, retired. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 24.5 MW | B · 单方官方披露 Portland General Electric Co reports Beaver generator 8: 24.5 MW, Natural Gas Fired Combustion Turbine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.2 MW | B · 单方官方披露 Portland General Electric Co reports Sullivan generator 3: 1.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.2 MW | B · 单方官方披露 Portland General Electric Co reports Sullivan generator 11: 1.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 9 MW | B · 单方官方披露 Portland General Electric Co reports Faraday generator 7: 9 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 17 MW | B · 单方官方披露 Portland General Electric Co reports Coffee Creek BESS generator CCRK1: 17 MW, Batteries, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 208 MW | B · 单方官方披露 Portland General Electric Co reports Coyote Springs generator 1: 208 MW, Natural Gas Fired Combined Cycle, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 18.8 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward Unit 2 generator 8: 18.8 MW, Natural Gas Internal Combustion Engine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 已完成 置信度 92% | — 4 MW | B · 单方官方披露 Portland General Electric Co reports Faraday generator 5: 4 MW, Conventional Hydroelectric, retired. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 130 MW | B · 单方官方披露 Portland General Electric Co reports Round Butte generator 2: 130 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.2 MW | B · 单方官方披露 Portland General Electric Co reports Timothy Lake Powerhouse generator 1: 1.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 18.8 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward Unit 2 generator 9: 18.8 MW, Natural Gas Internal Combustion Engine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 3.3 MW | B · 单方官方披露 Portland General Electric Co reports River Mill generator 2: 3.3 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 18.8 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward Unit 2 generator 7: 18.8 MW, Natural Gas Internal Combustion Engine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 25.5 MW | B · 单方官方披露 Portland General Electric Co reports Oak Grove generator 1: 25.5 MW, Conventional Hydroelectric, (OS) Out of service and NOT expected to return to service in next calendar year. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 68.3 MW | B · 单方官方披露 Portland General Electric Co reports Beaver generator 4: 68.3 MW, Natural Gas Fired Combined Cycle, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 19.2 MW | B · 单方官方披露 Portland General Electric Co reports Faraday generator 6: 19.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 45 MW | B · 单方官方披露 Portland General Electric Co reports Pelton generator 1: 45 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 171 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward generator 2: 171 MW, Natural Gas Fired Combined Cycle, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 32.4 MW | B · 单方官方披露 Portland General Electric Co reports Pelton generator 3: 32.4 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 已完成 置信度 92% | — 3.1 MW | B · 单方官方披露 Portland General Electric Co reports Faraday generator 2: 3.1 MW, Conventional Hydroelectric, retired. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 200 MW | B · 单方官方披露 Portland General Electric Co reports Carty Generating Station generator GEN2: 200 MW, Natural Gas Fired Combined Cycle, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 18.8 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward Unit 2 generator 10: 18.8 MW, Natural Gas Internal Combustion Engine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.2 MW | B · 单方官方披露 Portland General Electric Co reports Sullivan generator 10: 1.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.2 MW | B · 单方官方披露 Portland General Electric Co reports Sullivan generator 5: 1.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 68.3 MW | B · 单方官方披露 Portland General Electric Co reports Beaver generator 6: 68.3 MW, Natural Gas Fired Combined Cycle, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.2 MW | B · 单方官方披露 Portland General Electric Co reports Sullivan generator 12: 1.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 已完成 置信度 92% | — 5.2 MW | B · 单方官方披露 Portland General Electric Co reports Bull Run Hydro generator 2: 5.2 MW, Conventional Hydroelectric, retired. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 18.8 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward Unit 2 generator 5: 18.8 MW, Natural Gas Internal Combustion Engine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 5 MW | B · 单方官方披露 Portland General Electric Co reports River Mill generator 5: 5 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 200 MW | B · 单方官方披露 Portland General Electric Co reports Seaside BESS generator SESD1: 200 MW, Batteries, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 68.3 MW | B · 单方官方披露 Portland General Electric Co reports Beaver generator 2: 68.3 MW, Natural Gas Fired Combined Cycle, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 已完成 置信度 92% | — 5.2 MW | B · 单方官方披露 Portland General Electric Co reports Bull Run Hydro generator 3: 5.2 MW, Conventional Hydroelectric, retired. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 25.5 MW | B · 单方官方披露 Portland General Electric Co reports Oak Grove generator 2: 25.5 MW, Conventional Hydroelectric, (OS) Out of service and NOT expected to return to service in next calendar year. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 112.5 MW | B · 单方官方披露 Portland General Electric Co reports Round Butte generator 1: 112.5 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 161 MW | B · 单方官方披露 Portland General Electric Co reports Biglow Canyon Wind Farm generator 3: 161 MW, Onshore Wind Turbine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.2 MW | B · 单方官方披露 Portland General Electric Co reports Sullivan generator 1: 1.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 68.3 MW | B · 单方官方披露 Portland General Electric Co reports Beaver generator 1: 68.3 MW, Natural Gas Fired Combined Cycle, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.4 MW | B · 单方官方披露 Portland General Electric Co reports Baldock Solar Highway generator BSH1: 1.4 MW, Solar Photovoltaic, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 100 MW | B · 单方官方披露 Portland General Electric Co reports Wheatridge 1 generator WND: 100 MW, Onshore Wind Turbine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 已完成 置信度 92% | — 642.2 MW | B · 单方官方披露 Portland General Electric Co reports Boardman generator 1: 642.2 MW, Conventional Steam Coal, retired. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 130 MW | B · 单方官方披露 Portland General Electric Co reports Round Butte generator 3: 130 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 312 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward generator 1: 312 MW, Natural Gas Fired Combined Cycle, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 176.4 MW | B · 单方官方披露 Portland General Electric Co reports Beaver generator 7: 176.4 MW, Natural Gas Fired Combined Cycle, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 18.8 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward Unit 2 generator 11: 18.8 MW, Natural Gas Internal Combustion Engine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.2 MW | B · 单方官方披露 Portland General Electric Co reports Sullivan generator 6: 1.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 163.3 MW | B · 单方官方披露 Portland General Electric Co reports Biglow Canyon Wind Farm generator 2: 163.3 MW, Onshore Wind Turbine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.2 MW | B · 单方官方披露 Portland General Electric Co reports Sullivan generator 8: 1.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 18.8 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward Unit 2 generator 6: 18.8 MW, Natural Gas Internal Combustion Engine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 18.8 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward Unit 2 generator 12: 18.8 MW, Natural Gas Internal Combustion Engine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 已完成 置信度 92% | — 5 MW | B · 单方官方披露 Portland General Electric Co reports Salem Smart Power Center generator SSPC: 5 MW, Batteries, retired. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 125.4 MW | B · 单方官方披露 Portland General Electric Co reports Biglow Canyon Wind Farm generator 1: 125.4 MW, Onshore Wind Turbine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 18.8 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward Unit 2 generator 2: 18.8 MW, Natural Gas Internal Combustion Engine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 19.2 MW | B · 单方官方披露 Portland General Electric Co reports North Fork generator 1: 19.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 已完成 置信度 92% | — 4.5 MW | B · 单方官方披露 Portland General Electric Co reports Faraday generator 4: 4.5 MW, Conventional Hydroelectric, retired. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 已完成 置信度 92% | — 3.1 MW | B · 单方官方披露 Portland General Electric Co reports Faraday generator 1: 3.1 MW, Conventional Hydroelectric, retired. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 9 MW | B · 单方官方披露 Portland General Electric Co reports Faraday generator 8: 9 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 3.3 MW | B · 单方官方披露 Portland General Electric Co reports River Mill generator 1: 3.3 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 21.6 MW | B · 单方官方披露 Portland General Electric Co reports North Fork generator 2: 21.6 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 68.3 MW | B · 单方官方披露 Portland General Electric Co reports Beaver generator 5: 68.3 MW, Natural Gas Fired Combined Cycle, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 3.3 MW | B · 单方官方披露 Portland General Electric Co reports River Mill generator 3: 3.3 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.2 MW | B · 单方官方披露 Portland General Electric Co reports Sullivan generator 4: 1.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 18.8 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward Unit 2 generator 1: 18.8 MW, Natural Gas Internal Combustion Engine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 68.3 MW | B · 单方官方披露 Portland General Electric Co reports Beaver generator 3: 68.3 MW, Natural Gas Fired Combined Cycle, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 75 MW | B · 单方官方披露 Portland General Electric Co reports Constable BESS generator CSTB1: 75 MW, Batteries, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 已完成 置信度 92% | — 5.2 MW | B · 单方官方披露 Portland General Electric Co reports Bull Run Hydro generator 1: 5.2 MW, Conventional Hydroelectric, retired. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 32.4 MW | B · 单方官方披露 Portland General Electric Co reports Pelton generator 2: 32.4 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1 MW | B · 单方官方披露 Portland General Electric Co reports Sullivan generator 9: 1 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 18.8 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward Unit 2 generator 3: 18.8 MW, Natural Gas Internal Combustion Engine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 18.8 MW | B · 单方官方披露 Portland General Electric Co reports Port Westward Unit 2 generator 4: 18.8 MW, Natural Gas Internal Combustion Engine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 207.9 MW | B · 单方官方披露 Portland General Electric Co reports Clearwater Wind East generator CWE: 207.9 MW, Onshore Wind Turbine, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 88 MW | B · 单方官方披露 Portland General Electric Co reports Coyote Springs generator 2: 88 MW, Natural Gas Fired Combined Cycle, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 已完成 置信度 92% | — 5.2 MW | B · 单方官方披露 Portland General Electric Co reports Bull Run Hydro generator 4: 5.2 MW, Conventional Hydroelectric, retired. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 3.9 MW | B · 单方官方披露 Portland General Electric Co reports River Mill generator 4: 3.9 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 300 MW | B · 单方官方披露 Portland General Electric Co reports Carty Generating Station generator GEN1: 300 MW, Natural Gas Fired Combined Cycle, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |
项目运营 进行中 置信度 92% | — 1.2 MW | B · 单方官方披露 Portland General Electric Co reports Sullivan generator 7: 1.2 MW, Conventional Hydroelectric, (OP) Operating. EIA-860M | 2026-06-01 | 核验证据 |